I Have Regressed

Ye-Olde-Site-of-Curiosities · 5 hours ago · discuss

The build of the distlation tank and engine is coming a long. Although the engine has been completed the distlation tank still needs a few details: Steps up to the tank platform A wooden ladder up to the top of the tank Two feeder pipes from the top (I need to drill a couple of wholes on the top of the tank) Door for underneath platform Most of these components have been completed and are wating to be added in.